Overview
Sugarbush Resort is a ski resort located in the Mad River valley in Warren, Vermont, owned by Alterra Mountain Company. It is one of the largest ski resorts in New England. The resort encompasses more than 4000 acres (16 km²) total, 484 trail acres (2.34 km²) skiable, 53 miles (85 km) of trails, and 16 ski lifts. Sugarbush has 111 ski trails, 18 additional marked wooded area, substantial off-piste skiing and riding, a summit elevation of , and a vertical drop of , second largest in Vermont after Killington, and the third largest in New England after Killington and Sugarloaf.
History
Sugarbush was opened on December 25, 1958, by Damon and Sara Gadd and Jack Murphy. In 1977, the Gadds sold the resort to Roy Cohen. Cohen purchased the Glen Ellen Ski Area (Mount Ellen) in 1979 and annexed it to Sugarbush. ARA Services purchased the resort in 1983, replacing the original gondola with the Super Bravo and Heaven's Gate triple chair lifts, effectively increasing uphill capacity from 450 skiers per hour to 1800.
Claneil Enterprises bought the resort in 1984 and transformed it into a four-season resort, purchasing adjacent tennis courts, restaurants, condominiums, and a golf course. Claneil improved the chairlift system by installing three new lifts on Mount Ellen. The American Skiing Company purchased Sugarbush in 1995 and installed seven new lifts, increased snowmaking by 300%, and built a sixty-three million gallon reservoir for snowmaking. During this period, Mount Ellen and the main part of Sugarbush were connected by the Slide Brook Express two-way quad chairlift; when it was installed was the world's fastest chairlift, and is still the world's longest detachable chairlift.
When the American Skiing Company bought Sugarbush, the Original Green Mountain Express (GMX) chair at Mount Ellen was moved to replace the aging North Ridge Double. Then the GMX was replaced with a new fixed grip quad from Doppelmayer that ran up to the base of Cliffs to encourage use of the new North Ridge Express and the Slide Brook Express. This lift became known as the "Slug" because it was slow and impractical. Summit Ventures replaced this chair with a Poma high speed quad which runs the full length of the original GMX (up to the Glen House), and "the Slug" is now Jay Peak's Metro Quad. Also, the North Lynx Triple was formerly the Sugarbravo triple chair, and was moved to the North Lynx peak to replace a platter lift when the Super Bravo detachable quad was installed.
From Wikipedia (CC BY-SA 4.0).