Transport infrastructure
Bandić frequently talked about the state of transport infrastructure in Zagreb, regularly announcing numerous capital infrastructure projects, which would allegedly remedy traffic problems in Zagreb. Some of these were urban motorways through densely populated Medvednica Foothills, a tunnel under the Medvednica that would connect Zagreb with Zagorje various tunnels and underpasses in the historic city centre, extensions of numerous arterial roads, such as Branimir Road and Prisavlje and building several new bridges over Sava near Jarun and Bundek.
A few projects were carried out: widening part of Ljubljana Avenue (which Bandić subsequently in a populist move renamed Zagreb Avenue), Radnička Road and Jankomir Bridge, and constructing Homeland Bridge and overpasses or underpasses at several high traffic junctions such as Remetinec Roundabout. A few new stretches of arterial roads were built, including filling a one-kilometre gap in Branimir Road, which took place from 2005 to 2016. Many projects were criticised for the poor quality of execution, such as an underpass which continued to flood regularly during rainfall despite specific repairs to that end, and the inconsistently marked cycling paths.
In 2016, the city renovated the pedestrian Sava Bridge, and in 2018 began works to renovate Liberty Bridge. In 2019, Sava Bridge was closed after a part of the pavement fell through onto the embankment below. Bandić said the bridge was safe and would be repaired within days. However, the failed pavement remained closed to traffic until the end of Bandić's mayoralty, at which time it was scheduled to be opened in 2022. After finishing the Liberty Bridge renovation in December 2019, the city began the renovation of Youth Bridge; this was also Bandić's last announcement of imminent works on his perennial Jarun Bridge project. The Liberty Bridge renovation was criticised by the Ministry of Construction and Spatial Planning for only renovating asphalt and railings instead of carrying out repairs to the dangerously corroded bridge structure.
Most of Bandić's involvements in transport infrastructure concerned car traffic. For instance, while the cycling infrastructure was expanded, it was still fragmentary and cycling rate lagged behind other European capitals, despite Zagreb having one of the smallest shares of car traffic in the commute modal split. Although Bandić announced numerous new lines in the core of Zagreb's public transport, its tram network, his administration did not realise any of these projects, leading to an unprecedented 20-year drought in tram line construction. In 2000, Bandić opened two new tram lines, Dubrava–Dubec and Jarun–Prečko, construction of which was finished during the previous mayor's term. These remained the last new tram tracks in the city. The Prečko turning circle remains marred by a property dispute, which at one point occasioned a temporary closure. In 2007, the city announced construction of seven new tram lines "over the next few years", including lines in Trešnjevka, Lanište, Dubrava, and the never realised Jarun Bridge, two different lines to Zagreb Airport, as well as proposals for further tram lines in Trnje and on the never built Vatikanska Street extension. Bandić would announce construction on many of these lines again until the end of his mayoralty. Further tram lines and other projects, such as reconstructing the tram storage yard or an intermodal terminal at Sava Bridge, were announced, but no such plans came to fruition by the end of the mayoralty. When one of the perennial airport tram projects was brought up by news media in 2019, Bandić denied he proposed it. On multiple occasions since the mid-2000s, Bandić had presented plans for a subway network; in 2014, the plan involved a 17-kilometre (11 mi) light rail line to be finished by 2017. Subway plans were revived after the 2020 earthquake, "so that trams would not cause vibrations [in the apartments]" of the residents in damaged city centre buildings, per Bandić.
In the early 2000s, the City of Zagreb selected Crotram's TMK 2200 as the lowest bid for conversion of Zagreb tram rolling stock to low-floor vehicles; the first trams were announced during Pavić's mayoralty. Bandić pushed for the purchase of TMK 2200s, which came to dominate the rolling stock with 140 units by 2010. Though he announced and lobbied for plans to sell Crotram units in a number of European cities, including Stockholm, Sofia and Helsinki, the deals all fell through, with Helsinki residents finding the test units "cramped and noisy", while Osijek, the other Croatian city with a tram network, found imported trams to be cheaper. In 2017, wheelchair ramps were installed in the low-floor trams, since the tram floors did not line up with platforms.
One of Bandić's long-running projects was the reconstruction of the Sljeme cable car. The original Sljeme cable car was opened by Mayor Pero Pirker in 1963. After long calling into question the safety of the cable car, Bandić closed the cable car in 2007 after the failure of an electric motor. In 2008, plans were announced for a new, higher capacity cable car to be opened in 2009. Money continued to be spent on the project, which eventually expanded to a €45 million scheme which would have included an extension with Zagorje at Bistra. Eventually, construction began in 2019 and only on the original cable car's route, while Bandić announced a new tram line under Medvednica, which was also not realised. The cable car was to be opened in 2020, but the opening was pushed back several times, including for "strengthening steel reinforcements" after the Petrinja earthquake. Bandić was criticised by the opposition for continuing with the expensive project after the devastating March 2020 earthquake. A legal expert also characterised the cable car terminal as a plagiarism of the Deloitte building in Oslo, Norway. The city announced that they would apply for EU funding to finance the cable car. ZET took out a 537 million kuna (€72 million) long-term loan to finance the project. The cost overruns included some highly overpriced construction materials, totalling at 0.4 percent under the limit which would require additional legal oversight. Bandić disavowed responsibility for the overruns, saying the causes were outside his control. As of 2021, the cost overruns were under investigation by USKOK following a 7-hour YouTube video by a pseudonymous whistleblower, and the cable car remained under construction.
In an attempt to alleviate traffic problems, the city built a number of parking garages in the early 2000s. Garages were built under Lang and Kvaternik Squares, drastically changing their appearance. In the latter case, the garage came to dominate a larger plan for a makeover of Kvaternik Square, which followed the removal of its popular farmers' market. In order to accommodate car traffic, highly trafficked zebra crossings were replaced with underground walkways. The new square was widely criticised as it became unattractive to pedestrians and consequently remained empty. A survey found the new Kvaternik Square to be the most unpleasant square in Zagreb. Some reconstruction and renovation projects were also criticised for shoddy workmanship. For example, the controversial British Square remodelling created a roundabout too narrow to be traversed by the city buses, while the fountain in its centre sprayed water on a nearby bus station (this particular remodelling was investigated by USKOK). The Homeland Monument on Stjepan Radić Square, unveiled in December 2020, was showing material wear within five months of its construction. The effect of these remodellings has been described as an "elimination of squares".
An early 2000s plan for a public parking garage for visitors of Children's Hospital Zagreb under the Elipsa High School Sports Ground behind Mimara Museum ballooned into a – later abandoned –310 million kuna (€43 million) private-public partnership project with an attached shopping mall. An alternative deemed more attractive by the Zagreb leadership was a garage under the Republic of Croatia Square. Bandić lobbied for the controversial project, which involved pedestrian entrances surrounding Ivan Meštrović's Well of Life, while garage ramps would flank the 19th-century Croatian National Theatre building. Late 2000s plans called for three further garages in the vicinity of Flower Square and one under Strossmayer Square, as well as 16 more inside various Donji grad blocks. Most of these plans were abandoned after opposition by art history societies and intervention by courts, the Ministry of Culture as well as SDP party leadership. One planned garage was constructed as a private venture within Centar Cvjetni (see § Flower Square affair). In 2010, the Zagreb Assembly enacted an ordinance against parking garages in Donji grad, effectively putting an end to the developments, although Bandić and Zagrebparking officials continued to toy with the idea of a garage under the theatre for several years afterwards. The spatial arrangement of the constructed garages (e.g. the close by Cvjetni Centar and Tuškanac garages) caused low occupancy at some of the garages while other parts of the neighbourhood lack adequate parking facilities. Several garages are located at the fringes of the central pedestrian zone; despite their original intent to alleviate congestion, they themselves have caused traffic jams and the increase of traffic in the city core.
In late 2017, the city authorities started removing trees surrounding the Meštrović Pavilion in the middle of the Square of the Victims of Fascism, prompting protests against Bandić's administration led by a citizens' initiative named Vratite magnoliju ("Bring Back the Magnolia"). The plan would see removed several old magnolias among many other trees and bushes, reducing the greenery around the Pavilion to a plain grass lawn. Bandić and another city official were prosecuted for damaging cultural heritage and other accusations regarding the square remodelling. The trees, some of which constituted protected city heritage and fixtures of Zagreb pop culture, were removed while the process was ongoing by the city authorities; some of the trees were reportedly "diseased", and some "overgrown", while the project documentation was contradictory on the others. The makeover also included removing Brač limestone steps and replacing them with concrete. At the end of the process, Bandić was found not guilty, and subsequently taunted protestors by cutting grass on the square while dressed in the uniform of Zrinjevac, the city's park maintenance company, which caused them to demand his resignation. The city administration also removed benches and placed signs forbidding walking on the green surfaces. While a few academics supported the square makeover, most were opposed, including architectural, landscaping and art history societies. The makeover polarised the public, leading to "guerrilla" tree planting actions suppressed by the police, the result was that the citizens much less often frequented or stopped at the square. The renewed square's "cold monumentality" has been compared to the architecture of totalitarian and fascist Independent State of Croatia, which had cleared part of the square in 1941–42 while converting the pavilion to a mosque.
In 2013, the city changed the zoning of the sole park in Savica neighbourhood in order to accommodate a plan to build a church in the park. Protests, which were ongoing by 2016, intensified in 2017, the election year, by which point Savica residents and activists held round-the-clock sit-ins to prevent construction crews from entering the park. A 2016 survey found that the vast majority of Savica residents were opposed to the project, including 72 percent of Catholic residents. Two weeks before the elections, Bandić promised that the project would be stopped and called for an end to protests. The Ministry of Environmental Protection and Spatial Planning refused to issue a location permit for building the church, and it appeared that the project, which would have placed the church in the most wooded area of the park, was cancelled. Nevertheless, it was renewed in 2018 after Bandić secured another term and began supporting the project. In 2019–20, while Bandić was attempting to pass a new general urban master plan, the church project was expanded to incorporate a shrine dedicated to Blessed Alojzije Stepinac and plans for pilgrim tourism which would have caused the removal of the entire park. The new master plan failed in the city assembly, and several months later the park was given a name; there were no further attempts to build in the park as of Bandić's death. The success of the Savica park protests was seen as a potential end to unchallenged decision making by Bandić and the city government.